Murco Westerleigh, Ethanol Blending Installation
An Ethanol Blending System that spanned work across the whole of the two sites. We were successful in securing both the Murco Wetserleigh and Murco Theale projects worth circa 450K.
Our scope included an MCC with HMI interface at the control room. A new 400 Amp sub main was extended from the existing MCC into a new switch room at Westerliegh. Large amounts of new containment, wiring to blending and off-loading Pumps and controls, metered dosing at each of the loading bays and Infra-red and linear heat cable fire detections systems.